|
Simply drill a 2" hole through the instrument
panel, insert the gauge. A U clamp then secures the instrument into
place from the rear of the panel. |
A 2 1/4" hole is drilled through the panels face,
however this type of instrument is mounted from the rear of panel and is
flush after installation. 4 small screws must be drilled through the
panel face to secure the gauge. |